Proceedings of 59th Annual Associated Schools of Construction International Conference

93 articles841 pagesPublished: December 11, 2023

Papers

Pages 1-9
Pages 10-19
Pages 20-27
Pages 28-37
Pages 38-46
Pages 47-55
Pages 56-64
Pages 65-73
Pages 74-83
Pages 84-92
Pages 93-102
Pages 103-111
Pages 112-120
Pages 121-129
Pages 130-138
Pages 139-147
Pages 148-156
Pages 157-165
Pages 166-174
Pages 175-185
Pages 186-194
Pages 195-203
Pages 204-212
Pages 213-222
Pages 223-233
Pages 234-242
Pages 243-251
Pages 252-260
Pages 261-270
Pages 271-279
Pages 280-288
Pages 289-297
Pages 298-307
Pages 308-316
Pages 317-325
Pages 326-335
Pages 336-344
Pages 345-353
Pages 354-362
Pages 363-371
Pages 372-380
Pages 381-389
Pages 390-398
Pages 399-407
Pages 408-416
Pages 417-425
Pages 426-434
Pages 435-443
Pages 444-452
Pages 453-461
Pages 462-469
Pages 470-478
Pages 479-487
Pages 488-496
Pages 497-505
Pages 506-514
Pages 515-522
Pages 523-531
Pages 532-540
Pages 541-549
Pages 550-559
Pages 560-568
Pages 569-577
Pages 578-586
Pages 587-595
Pages 596-604
Pages 605-613
Pages 614-622
Pages 623-631
Pages 632-640
Pages 641-649
Pages 650-658
Pages 659-667
Pages 668-676
Pages 677-685
Pages 686-694
Pages 695-703
Pages 704-713
Pages 714-722
Pages 723-731
Pages 732-740
Pages 741-749
Pages 750-757
Pages 758-766
Pages 767-776
Pages 777-785
Pages 786-792
Pages 793-801
Pages 802-806
Pages 807-815
Pages 816-824
Pages 825-833
Pages 834-841

Keyphrases

360 Virtual Reality (360VR), 3D model, 3D Model Design, 3D printing2, 3DCP, academic performance, Academy-Industry Partnerships, ACCE accreditation, Accidents, Accreditation, Active Exploration, Additive Manufacturing, ageism, Aggregates, Aligned Learning Outcomes, Alkali-silica reactivity, alternative grading, Amendments, ANOVA, Apprenticeships, arthropod simulation platform, Artificial Intelligence (AI), assessment2, assessment methods, Assessment Report, Attentional Allocation Impact, attitudes, Automated Clash Resolution, Automation2, Benefits, BIM, BIM Execution Plan, BIM Standards, blisters, BMPs, Bridge, Bridge Condition, Bridge Maintenance Costs, Bridge Maintenance Optimization, Bridge Performance, Buildability, building construction2, building facade inspection, Building Information Modeling3, Building Information Modeling (BIM)2, buildings, built environment2, California, career path, career pathways, career progression, Case Study Project, case-based learning, CEM Education, certification, Certifications, Challenges2, Change Order, Clash Resolution, Close-out, close-range photogrammetry, Co-teaching, College Credit Articulation, communication, Competency Grading, Concrete2, Constructability, Constructability Review, construction6, Construction Cost, Construction Curriculum, Construction Drones, Construction duration, Construction Education7, Construction Handover, Construction Industry2, Construction Knowledge and Skills, Construction Labor Shortage, Construction Management3, construction material, Construction projects, Construction Safety5, construction safety and health, Construction Schedule, Construction Scheduling, Construction Spanish, construction technology, Construction Worker Health, Construction Workers, Construction workforce, Constructivism, Contractors, cost, cost control, Cost overrun, Cost overruns, COVID-193, Covid-19 Construction Education, Covid-19 Construction Research, Covid-19 Faculty Impact, COVID-19 impact, critical thinking, culture, data extraction, data management, Decarbonisation, decision support, deep learning, Demolition, Design Coordination, Design-Build, detection, differential settlement, diffusion, digital demonstrator, discipline, Distance Discrepancy, diversity, domestic arthropods, Downstream, Drivers, Drone2, Drones2, Drywall Construction, Durability, Education2, Education curriculum, Electrical Knowledge, Electrical Survey, Electrocution, Embodied carbon2, embodied energy, embodied water, empirical study, Employment, Energy and Atmosphere, energy efficiency, energy efficiency measures, energy saving, environment, environmental impact, Environmental impact of buildings, Estimating, Exoskeleton, experiential learning, explanatory model, Exterior Finishes, facade ordinance law, Face Mask, Facilities Management, Faculty Advisor, Fatal Four, Fatigue2, Federal Contracting, Fixed Budget-Best Value, fly ash, Food Service Operations, Gamified Pedagogy, Gen Z, gender, Girvan-Newman algorithm, granular aggregate roof, graph theory, Grease Interceptors, green construction, Heart rate reserve, heat pumps, highway project, Hispanic Safety Culture, historical building, Home Appraisal, Honor Society, human laborers, Human-drone interaction, HVAC Mechanical Contractor, Immersive Environment, Immersive training, indoor environment, Indoor Environmental Quality, Industry, Industry Practitioners2, Information Turnover, Innovative Project Delivery, instructional videos, interests, Ireland2, Jump into STEM2, K-12 education, Lab Exercises, labor efficiency, labor productivity, labor shortage, laboratory, laser scanning, LatCrit, LCA, LCA applications, Lean Construction, learning styles, learning technology, LEED, LiDAR, Life Cycle Analysis, Life cycle assessment tools, Life cycle cost., Life Cycle Energy, literature review, long-term performance, Louis Stokes Alliance for Minority Participation, machine learning3, Maintenance, market concentration, Mass Timber, Material Delivery Delay, Materials and Resources, mathematics, mechanical, Mechanical Electrical and Plumbing, Mechanics of Materials, Meeting Owl Pro, mental health, Metropolitan Statistical Areas, Military construction, mineral admixtures, Minority Serving Institutions, Mitigation, modification, Modular Construction, modularization, Monte Carlo simulation, Mortar Bar Test, multiple criteria, Net Zero, Nigeria, NIST, non-granular aggregate roof, nZEB, Occupational Health and Safety, Occupational Safety and Health, OFER Scale, Oil and gas projects, older workers, online course, Online Education Efficacy, Open Lane, Open-resource Exams, Operational Performance, Operations & Maintenance, OSHA, Outdoor worker health, Outsourced Labour, Pandemic, Pandemic Impact, payback period, pedagogy, Performance-based specs, Period of Performance, phrases, Physical Demands, Physiological Metrics, Physiological status monitoring technology, Plan Reading, Plastic waste, Plumbing, Political consumerism, ponding, post-secondary education, prediction, predictive model, Prescriptive codes, Private-Public Partnership, Project Capacity Analysis, Project Controls, Project Delays, project management3, Project Stakeholders, Projects, Proxemics, qualitative research, Quality of Experience, Recycling, Residential, risk analysis, risk factors2, risk management, risk-based-cost-estimation, Roofing, Roofing Distributors, safety3, safety culture, Safety Information, Safety Technology, Sanitary Sewer, schedule delays, Schedule overrun, Scheduling2, science, secondary education, sense of belonging, service life, Shelter design, Sigma Lambda Chi, silica fume, simulation, Skilled trade, skills training, social sustainability, software, space heating, SPF roof, Statics, STEM, student learning outcomes, student persistence, Student Preparedness, student training, study abroad, Subcontractor, Supply Chain Management, Sustainability5, Sustainable Labor Practices, Sustainable practices, Sustainable Site, teaching methods, Teaching with Industry, Technology3, technology acceptance, Tertiary Institution, theoretical model, time management, tradeswomen challenges, tradeswomen retention, training, training assessment, Transportation Construction workers, Trialability, Turnaround, UAS2, UAV, UK, undergraduate research, Undergraduate Research Funding, United Kingdom, University, Value Engineering, Value Prediction, Virtual Reality2, waste, waste collection, Water efficiency, wearable devices, wearable robots, Welfare, well-being, Wildfire, Women, Women in Construction, Workforce, workforce development