Author:Vladimir Maslak
 Keyphrasesautomated process control system, BIM technology, Field study of the stress-strain state, geotechnical monitoring, geotechnical monitoring system, Geotechnical risks, risk management, risk rating, severo muisky tunnel, stress-strain state, tunnel construction, underground structure.  | 

